2020-11-10
Indian Hill High School needed an Earth Retention System to support a new sports complex which included a tennis court, sidewalks, and sports facility. For this concept to become a reality, structures worked alongside with Megan Construction Company, Inc and… Read More
2020-10-29
Structures worked along side Miron Construction on a new YMCA facility for the Wisconsin Rapids community. Once an obsolete and mostly vacant downtown mall, the new YMCA is now a lively accessible facility convenient to several nearby low-income communities. The… Read More
2020-10-05
Structures collaborated with Frana Companies and Damon Farber in the design, engineering and construction process to reimagine a neglected street of Edina’s famed 50th and France neighborhood into an extended and improved shopping district. Once an old cafés parking lot,… Read More
2020-09-14
In 2019 Structures worked alongside Novak Construction and Frattalone Companies to build one of the largest Earth Retention systems in the Twin Cities. The new Costco Wholesale once a 166,800 square foot piece of land filled with varied topography, is… Read More
2019-03-28
Structures was solicited for the VyStar Credit Union project in Orange City, Florida to come up with a value engineered design for a proposed H-Pile retaining wall system. The credit union was challenged with using minimal space for the retaining… Read More
The Moline is a project centered in the heart of historic downtown Hopkins. The Architect was challenged to add an outdoor amenity deck to satisfy the new residences. The amenity deck includes a putting green, grill station and bar, firepit,… Read More
St. John’s Episcopal Church set forth to remodel their basement classrooms. Doing this required the installation of a new Handicap ADA ramp from street level down to the basement. The Architect used Anchor Brisa retaining wall units to hold back… Read More
2019-02-20
The “Open Doors Open Futures” project for Westminster Presbyterian Church was designed with both permeable and non-permeable pavers. The non-permeable pavers were the Belgard Rinn Padio 14 multi-sized paver system, 80mm thick, in a Graphite color. The permeable pavers used… Read More
2018-02-22
The Gibraltar Compressor Station is just one small piece to the Gibraltar and Buffalo Creek System pipeline project in the Appalachian Mountains of Pennsylvania. Columbia Midstream (Part of TransCanada) solicited the services of Glenn O Hawbaker and RediRock wall systems… Read More
The De La Pointe building is one of two projects completed by Graves Development Properties in Uptown, Minneapolis in 2017. Nestled on the corner of Holmes Ave and W 31st St, De La Pointe used permeable pavers to capture storm water on their… Read More